Grove Church Remodel ─ Marysville, WA

Project Type: Tenant Improvement

Size: 45,000-ft²

Description: Project includes extensive remodel of additions to the existing church including an elevator, replacement / relocation of utility service, major lighting upgrades and power upgrades in tenant spaces.  Design includes new utility service application / building load profile extrapolation of future tenant build-out projects, elevator selection coordination, coordination of utility cutover requirements.


SW Suburban Water/Sewer Administration Building ─ Burien, WA

Project Type: New Construction

Size: over 27,500-ft² 

Description: Project includes conversion of an abandoned site with various buildings in place into a new administration/operations building with detached vehicle storage/maintenance shops and decant facilities for the water/sewer district.  Design includes preliminary site scoping for demolition, utility services/property impacts, full schematic, design development, construction documents phasing for proper planning of facility functions,  complete utility services/impact mitigation coordination, design of whole building normal and standby power distribution systems, solar power, full power/lighting design and design of distributed fire alarm, tele/data/SCADA low voltage cabling and infrastructure.


Village Green Community Center and Kingston Regional Library ─ Kingston, WA

Project Type: Civic with Tenant Improvement for the Library

Size: 23,000-ft² on 10-acres

Description: Project includes a LEED Silver, 23,000-ft² community center housing the regional library, Boys and Girls Club, a senior center, multi-purpose recreational facilities, community meeting rooms, a commercial kitchen and administrative offices.  Design includes full power, lighting, site coordination, generator design, exterior lighting, mechanical equipment, access control, CCTV, security system, fire alarm and cost estimating.  

In addition, Library design includes envelopment of LEED silver building components into the design along with a raised floor concept for feeding library stacks, low voltage data cabling and lighting needs to avoid ceiling clutter and distribution problems.  Design elements include full tenant power and low voltage design along with lighting controls and extension of building security and access control components into the tenant space. 

Village Green Community Center.jpg

Preston Mill Park ─ Preston, WA

Project Type: Improvements

Size: 22 acres

Description: Project includes lighting and power for four small structures and surroundings.  Design includes utility service and power distribution and lighting for a tunnel path and pathway steps.


City of Seatac - Water District #125 - Power Analysis ─ Tukwila, WA

Project Type: Power Analysis

Size: n/a 

Description: Project includes analyzing of utility, tenant and distribution metering, demand and usage.  Design includes tenant metering of utility power, analyzing output data and trend seeking for patterns of abnormal power usage.


Portland Exposition Center – Portland, OR

Project Type: Assessment

Description: Project includes facilities condition assessment and maintenance program for the convention center.  Analysis includes on-site inspections, life-cycle, deficiency and inventory analysis of existing electrical systems.


Olympic View Water District - Administration Building ─ Edmonds, WA

Project Type: New Construction

Size: 13,500-ft²

Description: Project includes an administration building, vehicle storage/maintenance shops and a water treatment plant for the Olympic View Water District.  Design includes complete utility services coordination, design of building and water treatment plant power distribution including installation of a whole building standby generator, full power/lighting design as well as design of tele/data/SCADA low voltage network cabling and infrastructure along with full building distributed fire alarm, security, access control and CCTV.


Olympic View Water District - Maintenance Building Generator Upgrade ─ Edmonds, WA

Project Type: Tenant Improvement

Size: n/a  

Description: Project includes a whole building standby generator system for the existing maintenance building.  Design includes re-routing of low voltage utility infrastructure into the maintenance shop along with some minor tenant improvement work including relocation of existing equipment, addition of yard lights and power for automatic gates.  


Kitsap County Sewer District #5 and Annapolis Water District - Administration and Operations Center* ─ Port Orchard, WA

Project Type: New Construction

Size: 24,100-ft²

Description: Project includes 5-building operations and maintenance facility including an 8,000-ft² operations/maintenance building, a 6,600-ft² administration building, and three support/vehicle storage buildings totaling 9,500-ft².  Design includes full utility coordination and optional standby power  for storm operations.


Silverlake Water/Sewer - Vehicle Maintenance ─ Bothell, WA

Project Type: New Construction and Tenant Improvement

Size: 11,100-ft²

Description: Project includes extension to an existing vehicle storage building and a new building for additional vehicle and maintenance space.  Significant changes were made to the original building with changes in entry and access points. Design includes site coordination, bunker generator power, site lighting, interior lighting, power and equipment receptacles, mechanical equipment connections, extension of the existing fire alarm system and access control, CCTV and security.  Cost estimating based on parameters in the scope of the project.


King County Loop Fleet Repair and Maintenance Building ─ North Bend, WA

Project Type: New Construction

Size: 10,000-ft²

Description: Project includes maintenance facility for the King County Loop program building which includes: vehicle storage, maintenance and supporting administrative spaces.  Design includes cost estimation services, utility coordination, interior/exterior lighting, power receptacles, equipment connections, mechanical equipment connections, telephone, data, fire and security systems.


King County Kent Department Public Defender ─ Kent, WA

Project Type: Tenant Improvement

Size: 4,500-ft²

Description: Project includes built out of office space.  Design includes lighting, power and data system design.


King County Multidisciplinary Services Contract - 2015 to the Present

Project TypeOn-call engineering services

Size: variable

Description: Provide multidisciplinary engineering services on a work order basis for maintenance, capital improvement, and repair projects at facilities operated by King County Facilities Management Division (FMD). Design includes building code and zoning code studies and reports analyzing existing problems and issues, making recommendations for resolution of those problems, and cost estimating for first cost and ongoing operational impacts to budget. 


King County Harborview Hall Homeless Shelter ─ Seattle, WA

Project Type: Tenant Improvement

Size: n/a

Description: Project includes creation of an emergency shelter in an unoccupied, ground floor space.  The City of Seattle eased code requirements for buildings via Director's Rule 11-2016.  This code modification dictates the minimum terms required to occupy such spaces as emergency shelters.  Requirements include someone must be awake at all times, no cooking, exit lighting and a phone available to call for help.  BrN's services include central plant power and fire alarm investigation, egress lighting and controls, general power, lighting revisions and coordination.


King County Northshore Public Health Center ─ Bothell, WA

Project Type: Tenant Improvement

Size: n/a

Description: Project includes improvements to existing medical clinic comprised of two suites on the second floor of the Evergreen Medical Center.  Interior finishes will be replaced throughout both suites.  The lobby, reception and staff areas reconfigured with modifications to casework and fixtures of exam rooms/office. 

Design includes site visits, utility/distribution solution, LV infrastructure path, as-builts for the purpose of demolition and documentation.  In addition, code compliance interior lighting, power and equipment planning, mechanical equipment coordination/circuiting, tele/data infrastructure, LV document set, fire alarm design, cost estimation, submittal review and construction support.


King County Downtown Public Health Building - 1st Floor ─ Seattle, WA

Project Type: Tenant Improvement

Size: n/a

Description: Project includes tenant space remodel. Design includes schematic solution stage of project without drawings/plans or specification.


King County Maleng Regional Justice Center ─ Detention Walk-in Refrigeration Equipment Replacement ─ Kent, WA

Project Type: Tenant Improvement

Size: n/a

Description: Project includes replacement of walk-in refrigeration unit.  Design includes site visit, confirmation of voltage, electrical panel and circuiting for all existing refrigeration/freezer unit


King County - Wheelchair Lift

Project Type: Tenant Improvement

Size: n/a

Description: Project includes site reconfiguration to install a self-accessible ADA wheelchair lift that replaces a 2 person operated lift.  Design includes solution to provide electrical as-builts for demo and design documentation.


King County Fire Protection District #47 - Apparatus Building ─ Ravensdale, WA

Project Type: Tenant Improvement

Size: n/a

Description: Project includes electrical design for installation of a replacement HVAC unit and L&I for review.


King County - Water District #90 ─ Renton, WA

Project Type: New Construction

Size: 7,500-ft²

Description: Project includes construction of administration building, vehicle storage/maintenance shops for King County Water District.  Project includes complete utility services coordination including installation of a whole building standby generator, full power/lighting design as well as design of tele/data/SCADA low voltage network cabling and infrastructure along with full building distributed fire alarm, security, access control and CCTV.


King County Library System (KCLS) - Kirkland Library Expansion ─ Kirkland, WA

Project Type: Tenant Improvement

Size: 19,000-ft²

Description: Project includes renovation / expansion the existing library by 4,000 ft².  The renovation aims to provide a pleasant, engaging environment that interacts with the surrounding community by including full height glass wall construction on all sides which creates an open and transparent environment featuring exposed architecture and indirect lighting from exterior views. Design includes full electrical power, lighting design, fire alarm expansion and full tele/data cabling and infrastructure build out in support of administrative and public computer workstations.


King County Library System (KCLS) Extension Branch, Southcenter Mall* ─ Tukwila, WA

Project Type: Tenant Improvement

Size: 12,000-ft²

Description: Project includes conversion of mall tenant space into an extension library for King County.  Design includes custom lighting design, low voltage cabling specification for library checkout and database functions, support for wireless networking and full power/lighting design.


King County - Preston Road Maintenance - Preliminary Master Planning and Design ─ Preston, WA

Project Type: New Construction

Size: 15 acre site

Description: Project includes master planning assistance and electrical design for a 15-acre site with a maintenance facility. Design includes utility site planning (power, LV), development of a campus building load profile based on customer anticipated use, a distribution riser diagram for distribution of power to all proposed outbuildings and full power and lighting.


City of Kirkland - UPS Replacement ─ Kirkland, WA

Project Type: Tenant Improvement

Size: n/a

Description: Project includes replacement of an existing 40KW UPS. Design includes field work, load calculations and demand metering.


Beacon Hill - Water District Administration Building ─ Kelso, WA

Project Type: New Construction

Size: 3,000-ft²

Description: Project includes building for administrative services for an existing operations facility on the same site.  Design includes site utility coordination, complete power and lighting systems, mechanical equipment, fire alarm system, security, intercom, access control and submittal review.  Design also includes the cross connection infrastructure for the new and existing building to include underground raceways, pull boxes, etc.

Status: Design phase


Brinnon Fire Station and Headquarters for Fire District #4* ─ Jefferson County, WA

Project Type: New Construction

Size: 10,900-ft²

Description: Project includes a 4,200-ft² apparatus bay, 3,360-ft² main floor support space, 1,200-ft² meeting room and 15,000-ft² for future living quarters.  Design includes full electrical design for power/lighting and coordination of fire station specialty systems.


City of Renton - Renton City Hall Video Conference Room* ─ Renton, WA

Project Type: Tenant Improvement

Size: n/a  

Description: Project includes conversion of existing office space into a state-of-the-art video conference room.  Design includes specialty lighting with full dimming controls, complete video conference television, camera, and tele/data design with remote access stations.


Renton Senior Center Multipurpose Room ─ Renton, WA

Project Type: Tenant Improvement

Size: 4,000-ft²

Description: Project includes remodel and lighting upgrades for the existing multipurpose room in the Renton Senior Center.  Design includes power distribution modifications and complete lighting and controls design utilizing BIM modeling and AGI32 lighting photometric analysis software with the goal of allowing for system modeling during the design process to verify project goals and lighting systems. 


Seattle Municipal Tower - 16th Floor ─ Seattle, WA

Project Type: Tenant Improvement

Size: n/a

Description: Project includes remodel of existing dental suite into office space for Immigration/Refugee Affairs.  Project includes full power and lighting, tele/data infrastructure, specifications, as-built records and permit/bid documents.


Seattle Municipal Tower - Floor 26 - Printer Relocate ─ Seattle, WA

Project Type: Tenant Improvement

Size: n/a

Description: Project includes relocation of 3 large scale Ricoh copiers.  The copiers transitioned out of the main building data center ( data center is slated for decommissioning and demolition).  Design includes relocation of power sources and routing of network controls back to building floor demark.


City of Seattle Facility Condition Assessments  ─ Seattle, WA

Project Type: Assessment

Size: 3.4 million-ft²

Description: Project includes electrical engineering support for conducting facility condition assessments for 50 City of Seattle locations, including maintenance facilities, police precincts, fire stations, administrative offices, parking garages, community centers, high rise buildings located in downtown, and Benaroya Hall concert hall. The total area of buildings included in the assessment was over 3.4 million square feet. BrN was responsible for recording electrical inventory, condition assessment, identifying deficiencies, and entering data for all buildings. Analysis included on-site inspections, life-cycle, deficiency and inventory analysis of existing electrical systems.


Seattle City Light - North Service Lot Upgrades ─ Seattle, WA

Project Type: Tenant Improvement

Size: 36,960-ft²

Description: Project includes upgrade of storage and operations lot into parking with electric vehicle charging stations for the City's fleet.  Design includes new utility service, electric vehicle charge station infrastructure and parking lot site lighting design.


City of Seattle Fleets and Facilities - Seattle Fire Department - Elevator Replacement ─ Seattle, WA

Project Type: Tenant Improvement

Size: n/a

Description: Evaluate the replacement and modernization impacts for an elevator upgrade in the Seattle Fire Department Headquarters building.


City of Seattle Fleets and Facilities - Seattle Municipal Tower- Floor 28 - SCL Workstation Addition ─ Seattle, WA

Project Type: Tenant Improvement

Size: n/a

Description: Project includes demo of existing mail room and addition of workstations per Seattle City Light standards.  Design includes existing infrastructure investigation and re-arrangement of circuits and low voltage cabling to support new workstations layout.


City of Seattle Airport Way South Campus - Facility Condition Assessment─ Seattle, WA

Project TypeAssessment

Size: n/a

Description:  Assessment activities include Level V takeoff of existing electrical infrastructure and inputting into XP Paragon data collection software.  Study results to be utilized for master planning purposes for existing SPU facility campus.


City of Seattle Fleets and Facilities - St. Charles - Facilities Condition Assessment ─ Seattle, WA

Project Type: Assessment

Size: n/a  

Description: Project includes facility assessment of multiple existing city buildings and supporting infrastructure for the City of Seattle.  Analysis includes on-site inspections, life-cycle, deficiency and inventory analysis of existing electrical systems.


City of Seattle Fleets and Facilities  - Airport Way Facilities ─ Seattle, WA

Project Type: Assessment

Size: n/a  

Description: Project includes facility assessment of five existing city buildings and supporting infrastructure for the City of Seattle.  Analysis includes on-site inspections, life-cycle, deficiency and inventory analysis of existing electrical systems.


City of Seattle Fleets and Facilities Seattle Municipal Tower - 37th Floor Seattle Dept. of Transportation Remodel ─ Seattle, WA

Project TypeTenant Improvement 

Size1,200-ft²

Description: Project includes Seattle Department of Transportation (SDOT) Traffic Management Center (TMC) on the 37th floor of the Seattle Municipal Tower to accommodate new monitors, equipment and furniture layout.  Design includes investigation of existing infrastructure to establish an accurate demolition plan and determine existing circuiting that may be reused for the new equipment.


City of Seattle Fleets and Facilities Seattle Municipal Tower - 53rd Floor Temporary Training Room ─ Seattle, WA

Project Type: Tenant Improvement

Size: n/a

Description: Project includes minimalist plan for electrical work.  Design includes power and data for workstations in a converted space to make a temporary training room for Seattle Police Department.  A rough order of magnitude cost generated for the City of Seattle to use to determine overall cost of conversion.


City of Seattle – Facility Condition Assessments for Fire Stations - Seattle, WA

Project Type: Assessment

Description: Project includes facility assessment of eight City of Seattle Fire Stations.  Analysis includes on-site inspections, life-cycle, deficiency and inventory analysis of existing electrical systems.


City of Seattle Fleets & Facilities - Fire Station #11 ─ Seattle, WA

Project Type: Seismic Upgrades

Size: 7,500-ft²

Description: Project includes full seismic upgrades along with minor tenant improvements upgrades including bunker gear storage/decontamination areas, revisions to existing living and apparatus functions and improvements to station alert and intercom/paging systems. Preliminary project services include site scoping of existing building conditions, incoming utility services and investigation into existing low voltage alerter and other specialty systems.  Design includes existing utility service and building distribution upgrades/code corrections/modifications, upgrades/modifications to existing alert system, full power and lighting coordination with tenant remodel areas, design of new lighting controls for energy code compliance, mechanical equipment and infrastructure planning for tele/data and low voltage systems.


City of Seattle Fleets and Facilities -  Fire Station #27 ─ Seattle, WA

Project Type: Tenant Improvement

Size: 6,000-ft²

Description: Project includes full seismic upgrades along with upgrades including new bunker gear storage/decontamination areas, revisions to living and apparatus functions and improvements to station alert and intercom/paging systems.  Design includes existing utility service and building distribution upgrades/code corrections/modifications, upgrades/modifications to existing alert system, full power and lighting coordination with tenant remodel areas, design of new lighting controls for energy code compliance, mechanical equipment and infrastructure planning for tele/data and low voltage systems.


City of Seattle Fleets and Facilities - Harbor Patrol Renovation Design ─ Seattle, WA

Project Type: Tenant Improvement

Size: 5,000-ft²

Description: Project includes utility service and generator power modification upgrades to facility distribution.  Design includes preliminary scoping/investigation into existing site utility conditions and subsequent reconfiguration of utility service equipment to allow for added downstream distribution space.  Project design parameters include relocation of existing generator buck/boost transformers, reconfiguration of existing utility distribution and associated feeders to allow for placement of new exterior utility service equipment.


City of Seattle Fleets and Facilities - Harbor Patrol HVAC Upgrade ─ Seattle, WA

Project Type: Tenant Improvement

Size: 5,000-ft²

Description: Project includes utility service and generator power modification upgrades to existing facility distribution setup, relocation of generator boost transformers and associated feeders to allow for placement of new exterior utility service equipment.  Design includes preliminary scoping/investigation into site utility conditions and subsequent reconfiguration of utility service equipment to allow for added downstream distribution space.


City of Seattle AWC, 4th Floor Seattle Police Department Vice Unit Workstations

Project Type: Tenant Improvement

Size: 7,592-ft²

Description: Design includes power and data / communication for new furniture layout in existing office, reception and conference spaces.


City of Seattle Fleets and Facilities ─ West Precinct Police Station ─ UPS Upgrade ─ Seattle, WA

Project Type: Tenant Improvement

Size: 2,000-ft²

Description: Project includes providing redundant power to the city’s existing data center supporting 911 and emergency operations.  Design includes full site survey of existing data rack power distribution configurations, evaluation of existing demand load data and introduction of new electrical distribution to allow for alternate source A/B wiring of existing data rack power infrastructure without disruption to existing data rack infrastructure power conditions.


City of Seattle Fleets and Facilities ─ Seattle Municipal Tower ─ 37th Floor Seattle Dept. of Transportation Remodel ─ Seattle, WA

Project Type: Tenant Improvement

Size: 1,200-ft²

Description: Project includes Seattle Department of Transportation (SDOT) Traffic Management Center (TMC) on the 37th floor of the Seattle Municipal Tower to accommodate new monitors, equipment and furniture layout.  Design includes investigation of existing infrastructure to establish an accurate demolition plan and determine existing circuiting that may be reused for the new equipment.


Seattle Municipal Tower – 26th Floor ─ Printer Relocate ─ Seattle, WA

Project Type: Tenant Improvement

Size: n/a

Description: Project includes relocation of 3 large scale Ricoh copiers.  The copiers transitioned out of the main building data center ( data center is slated for decommissioning and demolition).  Design includes relocation of power sources and routing of network controls back to building floor demark.


Seattle Municipal Tower ─ 16th Floor ─ Seattle, WA

Project Type: Tenant Improvement

Size: n/a

Description: Project includes remodel of existing dental suite into office space for Immigration/Refugee Affairs.  Project includes full power and lighting, tele/data infrastructure, specifications, as-built records and permit/bid documents.


City of Seattle Fleets and Facilities ─ West Precinct Police Station ─ Call Center New Workstations ─ Seattle, WA

Project Type: Assessment

Size: n/a

Description: Project includes investigation of current conditions and demand monitoring information at the call center workstations.  Design includes analysis of conditions for optimal approach for new work stations and narrative report with a ROM cost of electrical work.


City of Seattle Fleets and Facilities - Airport Way South -  Building C - Electric Vehicle Charge Upgrade ─ Seattle, WA

Project Type: Civic Tenant Improvement

Size: n/a

Description: Project includes standby power distribution and infrastructure for 20 electric car charging stations in support of the city’s growing fleet of electric cars and maintenance vehicles. Design includes load demand analysis and additions, infrastructure improvements and custom routing scenarios for variety of different car charger equipment locations.


City of Seattle Fleets and Facilities - Airport Way Center, Bldg A - 4th Floor Suite 402 Workstations ─ Seattle, WA

Project Type: Tenant Improvement

Size: n/a

Description: Project includes new workstations installed in existing enclosed offices and new workstations installed in an open office space.  Design includes adequate power to the open office space workstations involving routing power and data down existing columns from existing panels in the electrical room located in the center of the floor behind the elevator shafts.


City of Seattle Fleets and Facilities - Airport Way South - Building C Workstation Additions ─ Seattle, WA

Project Type: Tenant Improvement

Size: n/a

Description: Project includes replacement of partitions with an electrified furniture system.


City of Seattle Fleets & Facilities - Headquarters Fire Department - Electric Vehicle Charging Station ─ Seattle, WA

Project Type: Tenant Improvement

Size: n/a

Description: Project includes electric vehicle charging stations in basement parking area.   Design includes load analysis and design work.


City of Seattle Fleets and Facilities - Seattle F&M - Fire Station #25 ─ Seattle, WA

Project Type: Generator Evaluation and Design

Size: n/a

Description: Design includes evaluation and design of a whole building standby generator system for the existing fire station, complete with demand metering/evaluation for generator sizing purposes, full utility coordination and new service and cutover of existing distribution.


City of Seattle Fleets and Facilities -  Fire Station #40 ─ Seattle, WA

Project Type: Generator Evaluation and Design

Size: n/a  

Description: Project includes evaluation and design of a whole building standby generator system for the existing fire station. Design includes demand metering/evaluation for generator sizing purposes, full utility coordination and design for new service and cutover of existing distribution.


City of Seattle Fleets and Facilities - AWC Bldg A and Bldg C - Generator Upgrades - Preliminary Phase ─ Seattle, WA

Project Type: Tenant Improvement 

Sizen/a

Description: Project includes investigation of existing power distribution arrangements for two facilities with an eye towards standby power for the buildings.  Design includes: 

  • site investigation into incorporating existing partial backup power under a whole building solution

  • reconfiguration options for intercepting/rerouting of existing utility service conditions

  • site challenges related to getting in/out of the existing facility and cutting power over with minimal down times to facility operations, and

  • a full cost estimated provided to the client


City of Seattle Fleets and Facilities - Fire Station Generators ─ Seattle, WA

Project Type: Evaluation and Design

Size: n/a  

Description: Project includes standby generator systems for a total of six fire stations and two police stations.  Design includes site evaluation of existing utility services, whole building demand load analysis, and site location of exterior packaged generator systems.


City of Seattle Fleets and Facilities -  Justice Center - Motorized Window Shades ─ Seattle, WA

Project Type: Tenant Improvement

Size: n/a

Description: Project includes power to motorized shades in reading and jury waiting rooms on the 12th Floor of the Justice Center.


City of Seattle Fleets and Facilities - Seattle Municipal Tower - Load Monitor ─ Seattle, WA

Project Type: Monitoring and Analysis

Size: 33rd Floor

Description: Project includes load monitoring and analysis of data center on 33rd Floor of Municipal Tower and a summary analysis and recommendations for adding new loads.


City of Seattle Fleets and Facilities -  Seattle Municipal Tower, Additional Electrical Vehicle Charging Station Installations ─ Seattle, WA

Project Type: Assessment

Sizen/a

Description: Project includes demand monitoring data to ascertain how many Electric Vehicle (EV) Charging Stations can be installed on parking level 11 after six EV Charging Stations are installed on the parking level 4.  Analysis based on 2014 Seattle Electrical Code that is newer and has different demand calculations than those used in the prior study.  Additionally, a rough order of magnitude of the costs for the stations based on the maximum EV Charging Stations that the distribution system can support.


City of Seattle Fleets and Facilities - Charles Street Metering Building HVAC & Roof Replacement ─ Seattle, WA

Project Type: Tenant Improvement

Size: n/a

Description: Project includes removal of rooftop HVAC equipment and Unit Heaters in the building.  All the rooftop HVAC equipment salvaged and reused with the exception of two air handler units that are replaced with three air handler units.  Design includes circuit design for the HVAC configuration including a linear unit heater and split heat pump system.


U.S. National Park Service - Facility Condition Assessment (FAC) - Olympic National Park Survey ─ Olympic National Park, WA

Project Type: Assessment

Size: n/a  

Description: Project includes onsite surveys of existing National Park facilities and supporting infrastructure in the Olympic National Park. Analysis includes on-site inspections, life-cycle, deficiency and inventory analysis of existing electrical systems.


U.S. National Park Service - Facility Condition Assessment (FAC) - Death Valley - Death Valley, NV

Project Type: Assessment

Size: n/a  

Description: Project includes onsite surveys of existing National Park facilities and supporting infrastructure in the Death Valley National Park.  Survey analysis includes on-site inspections, life-cycle, deficiency and inventory analysis of existing electrical systems.


Port of Portland Terminal 6 ─ Portland, OR

Project Type: Assessment

Size: n/a  

Description: Project includes facility and equipment condition assessment of a US West Coast container terminal for the Port of Portland.  Analysis includes on-site inspections, life-cycle, deficiency and inventory analysis of existing electrical systems.


Pegasus Farm* ─ Snohomish, WA

Project Type: Tenant Improvement

Size:  100-acre, 12-building 

Description: Project includes a 100-acre, 12-building, thoroughbred horse farm.  Design includes extensive utility and full optional standby power distribution, along with complete power, lighting, fire alarm and tele/data design for all buildings.


City of Mercer Island - Luther Burbank Bldg/Facility Upgrade ─ Mercer Island, WA

Project Type: Tenant Improvement

Size:  77-acres park

Description: Project includes new exterior site lighting to the park’s existing parking lots and extensive path walkways.  Design includes photometric analysis and full lighting design.


Tateuchi Center - formerly known as Performing Arts Center Eastside (PACE) ─ Bellevue, WA

Project Type: Street Lighting

Size: 135,000-ft² (venue size)

Description: Project includes City of Bellevue street lighting improvements in support of a new Performing Arts Center. Design includes photometric analysis of street lighting, city coordination and traffic controls/power distribution.


Northlake Building, Washington Education Association (WEA)* ─ Federal Way, WA

Project Type: New Construction

Size: 61,000-ft²

Description: Project includes 2-story office building for administrative and training space for WEA.  Design includes complete core and shell, as well as all tenant improvement electrical design of the building for office and support use.


Delta Society Building* ─ Federal Way, WA

Project Type: New Construction

Size: 30,000-ft²

Description: Project includes 2-story building providing administration space and dog training facilities for the Delta Society.  Design includes full utility service coordination, site lighting, complete power, lighting, fire alarm and tele/data design for all spaces.


City Church ─ San Luis Obispo, CA

Project Type: New Construction

Size: 29,000-ft²

Description: Project includes prefabricated steel frame church complete with adult, teen and kid friendly support spaces.  Design includes extensive fire/domestic water pump coordination, utility planning/coordination/application submittal (PGE), building power distribution and service coordination, mechanical equipment coordination, power device layouts and lighting design services for interior house, sanctuary and exterior site components including land=use ordinance coordination and photometric analysis for areas involved.


Consulate General of Canada  - Canadian Consulate ─ Seattle, WA

Project Type: Tenant Improvement

Size: 23,500-ft²

Description: Project includes conversion of office space into the new administrative and passport services center for the Canadian Consulate.  Design includes tenant distribution revisions, and power and lighting design with Seattle energy code compliant controls.


Bethany Church - Christian Education Building ─ Seattle, WA

Project Type: New Construction

Size: 13,200-ft²

Description: Project includes demolition of existing education building and building a new facility that will provide community spaces to support youth and adults alike.  The facilities includes community assembly venue, kitchen, daycare services for working families and classroom/learning spaces for youth.  Design includes building load profiling, utility liaison and application design/submittal, MEP criteria preparation for bidder design selection.


Bainbridge Island Museum of Art ─ Bainbridge Island, WA

Project Type: New Construction

Size: ~16,000-ft²

Description: Project includes public art museum complete with multiple exhibit/gallery display spaces, community gathering facilities, green roof and archive storage facilities along with extensive site improvements.  Design includes power and exhibit/gallery lighting and controls design, tele/data/low voltage infrastructure accommodations, device/equipment layouts, coordination of new utility service and implementation of WA State Energy Code requirements.


Lummi Tribe Dormitory ─ Bellingham, WA

Project Type: New Construction

Size: 13,000-ft²

Description: Project includes dormitory/study hall for the Lummi Indian Tribe taking advantage of a hybrid combination of modular and site-built construction.  Design includes full electrical power/lighting design, coordination of all modular-to-field adapt conditions, as well as coordination of specialty systems for the facility.


Lively Hope Church ─ Spanaway, WA

Project Type:  Photometrics Study

Size: 12,200-ft²

Description: Project includes development of a lighting photometric model to show proper lighting levels in all interior church spaces.  Design includes interior and daylight controls to comply with Non Residential Energy Code requirements.


East James Court Woonerf Park ─ Seattle, WA

Project Type: New Construction

Size: 7,332-ft²

Description: Project includes a new community park.  Design includes lighting design using Seattle Energy Codes specification, lighting controls and power, equipment and device layout for the park.


S'Klallam Tribe's Social Services Building ─ Port Gamble, WA

Project Type: New Construction

Size: 6,500-ft²

Description: Project includes office building, housing, judicial courtrooms, a community library, social, office space, and administrative space for the S’Klallam Indian Tribe.  Design includes full electrical power/lighting.


S'Klallam Social Services Building ─ Port  Gamble, WA

Project Type: New Construction

Size: 6,500-ft²

Description: Project includes office building, housing, judicial courtrooms, social office space, and administrative space for the S’Klallam Indian Tribe.


City of Auburn - Auburn Golf Course ─ Auburn, WA

Project Type: New Construction

Size: 6,000-ft²

Description: Project includes golf clubhouse, surface parking with site lighting design, golf cart storage with battery charging stations, pro shop, and commercial kitchen and banquet facilities.


SPARC HVAC & Roof Replacement ─ Seattle, WA

Project Type: Tenant Improvement

Size: n/a

Description: Project includes roof renovation with selected HVAC equipment replacement.  Design includes upgrade of the existing circuits from 20A to 30A 12V and 240V circuits.  In addition, one additional circuit to accommodate a heater for the greenhouse portion of the building.


Mars Hill Church Shoreline HVAC ─ Shoreline, WA

Project Type: Tenant Improvement

Size: 5,600-ft²

Description: Project includes replacement of indoor heating units with HVAC outdoor units on the roof.  Design includes four units utilizing four existing circuit breakers and new branch circuits to the roof.


Barkley Building Suite 204 FBI ─ Bellingham, WA

Project Type: Tenant Improvement

Size: 5,000-ft²

Description: Project includes conversion of office space into new administrative and debrief rooms for the FBI.  Design includes all tenant distribution revisions, power and lighting design along with mandated and specialized security and access control features.


Myrtle Masonic Lodge* ─ Issaquah, WA

Project Type: Tenant Improvement

Size: 3,500-ft²

Description: Project includes historic, 3-story building updates in support of tenant improvements to the existing Masonic lodge facility.  Design includes new utility electrical service, elevator addition, full fire alarm system design and renovated lighting.


Street Lighting - First Park at Meridian Campus ─ Lacey, WA

Project Type: Street Lighting

Size: .5 miles

Description: Project includes street lighting for First Park at Meridian Campus.  Design includes lighting placements cover approximately .5 miles on Orion Drive NE.  All design criteria meet Washington Department of Transportation (DOT) requirements and standards.


Washington State Services for the Blind Remodel ─ Seattle, WA

Project Type: Tenant Improvement

Size: 1,500-ft²

Description: Project includes demolition of selected areas of the building to allow for office space, Home Maintenance and Low-vision Lab and a workshop.  Design includes relighting and adjusting receptacles to fit the remodeled areas creating work spaces on both floors of the 2-story building.


Christ Church Greenwood   ─ Everett, WA

 Project Type: Assessment 

Size: n/a

Description: Project includes review for code compliance. 


South Kitsap High School (SKHS) Greenhouse ─ Port Orchard, WA

Project Type: Tenant Improvement 

Size: n/a   

Description: Project includes upgrade heat to existing greenhouse.


n/a ─ size information not available or not applicable for this project

 * Projects performed through other companies